1. Home
  2. »
  3. Manufacturing Infrastructure

Overview of our manufacturing facility ​

We have two state-of-the-art production sites with total combined capacity of more than 15,000 TPA. Each site has its dedicated infrastructure and utilities including a boiler, tank farm, waste treatment plant and storage facilities.

Site 1 at Ankleshwar, Gujarat

Site 1 at Ankleshwar, Gujarat

  • Production capacity of ~13800 TPA
  • Semi & Fully automated plant
  • >30 reaction capabilities
  • Reaction scale 1000-25000 lts
  • Total reactor volume – 2.1 mn cu lt
  • Land area: 71362 m2
    • Built-up area: 35000m2
    • Green belt area: 24796 m2
  • 5 manufacturing blocks
  • Centralised workshop and engineering store
  • Site with dedicated infrastructure & utilities including boiler, tank farm, waste treatment plant and storage facilities

Site 2 at Ankleshwar, Gujarat

  • Production capacity of 2,000 MT 
  • Fully automated plant
  • Site with dedicated infrastructure & utilities including boiler, tank farm, waste treatment plant and storage facilities.
  • The plant includes vapour phased, gas phased reactor for continuous gas-phase reactions, chlorination and fluorination of pyridine derivatives.
  • Land available for further expansions. Additional multipurpose manufacturing plants in progress to create additional capacities in advance for customer needs.